Quantity Survey  ·  Level 6
Construction Project Management I
Chapter 4: Prepare material, plant and labour schedule
📚 4 Topics
⚑ What you will be able to do

By the end of this chapter, you will be able to:

  • determine project evaluation criteria by following standard operating procedures accurately.
  • carry out a financial evaluation using the project budget correctly.
  • evaluate performance standards by applying the correct procedures.
  • prepare a clear and detailed project evaluation report following the right steps.
  • conduct a thorough site inspection based on the project scope.

These skills will help you manage construction projects effectively, ensuring everything runs smoothly and meets quality standards.

The preparation of material, plant and labour schedules forms a critical foundation in construction project management, particularly for Quantity Surveyors who play a pivotal role in cost control and resource allocation. Effective scheduling ensures that resources align with project activities, preventing costly delays and inefficiencies. In the Kenyan construction industry, where projects often face challenges such as supply chain disruptions and fluctuating labour availability, a well-structured schedule is indispensable for maintaining timelines and budgets. This chapter begins by examining project activities based on the project scope, a step that anchors all subsequent scheduling and resource planning.

4.1 Project Activities Based on the Project Scope

In construction, the project scope defines the total work required to deliver a project successfully. For Quantity Surveyors, understanding and breaking down this scope into detailed activities is essential for accurate scheduling and cost estimation. The Kenyan context, with its regulatory frameworks such as the National Construction Authority guidelines and local procurement requirements, demands that project activities are clearly identified and sequenced to ensure compliance and efficiency. This section dissects the nature of project activities, their classification, and their role in the preparation of resource schedules.

4.1.1 Nature and Types of Project Activities

Project activities are discrete tasks or sets of tasks that collectively achieve the project objectives. Recognizing the nature and types of these activities helps Quantity Surveyors to allocate materials, plant, and labour efficiently while managing costs and timelines.

Characteristics of Project Activities

  • Discrete and Measurable: Each activity represents a specific portion of work that can be quantified and tracked, such as excavation or concrete pouring. This measurability is crucial for progress monitoring and payment certifications at institutions like county governments.
  • Interdependent: Activities are often linked, with one depending on the completion of another. For example, foundation laying must precede wall construction in a hospital expansion project.
  • Time-Bound: Activities have defined start and finish times, essential for creating realistic project schedules and avoiding overruns.
  • Resource-Driven: Each task requires specific types and quantities of materials, plant, and labour, which the Quantity Surveyor must identify for budgeting and procurement.
  • Scope-Defined: Activities directly reflect the project scope’s description, ensuring no work outside the agreed terms is scheduled or billed.

Common Types of Project Activities

  • Pre-Construction Activities: These include site clearance, surveying, and setting out, which prepare the site for construction. For example, a retail mall construction in Nairobi requires precise site surveys to align foundations correctly.
  • Construction Activities: Core works like excavation, formwork, concrete works, masonry, and finishes fall here. These are the bulk of the scope and resource consumption.
  • Commissioning and Testing: Activities that ensure systems and installations meet specifications before handover, such as electrical testing in a university dormitory.
  • Post-Construction Works: Includes site cleanup, landscaping, and snagging, often overlooked but critical for client satisfaction and final payment.
  • Administrative Activities: Project meetings, inspections, and documentation that support the physical works but consume time and labour resources.

4.1.2 Activity Identification and Breakdown Techniques

Breaking down the project scope into manageable activities is a fundamental step for Quantity Surveyors preparing schedules. This process involves systematic approaches to ensure no task is omitted and resource needs are clear.

Work Breakdown Structure (WBS)

  • Hierarchical Decomposition: WBS divides the entire project into smaller, more manageable components, facilitating detailed scheduling and cost estimation. For instance, a county hospital renovation project might have WBS levels for structural works, finishes, and services.
  • Scope Verification: Each WBS element ties back to the project scope, ensuring alignment with client requirements and contract documents.
  • Resource Allocation Basis: The WBS provides a framework for associating materials, plant, and labour with each activity, enhancing accuracy in scheduling.
  • Facilitates Progress Tracking: Breaking down work into clear segments allows for progress measurement and reporting, crucial for projects under the Ministry of Health.
  • Improves Communication: A detailed WBS helps all stakeholders understand the scope and schedule, reducing disputes and misunderstandings.

Activity Sequencing and Dependencies

  • Logical Order of Execution: Identifying which activities must precede others prevents scheduling conflicts and resource clashes. For example, plumbing installations cannot proceed before wall finishes are complete in a hotel project.
  • Types of Dependencies: Finish-to-start, start-to-start, finish-to-finish, and start-to-finish relationships define how activities relate and influence scheduling.
  • Use of Network Diagrams: Tools like the Critical Path Method (CPM) visually represent activity sequences and identify the longest path determining project duration.
  • Incorporating Lead and Lag Times: Adjusting for overlaps or delays between activities optimizes resource utilization and project flow.
  • Adjusting for Site Constraints: Physical or regulatory constraints identified during sequencing affect how activities are planned, such as restricted working hours in Nairobi Central Business District.

4.1.3 Integration of Project Activities with Resource Scheduling

Once activities are identified and sequenced, Quantity Surveyors integrate them with resource schedules to ensure materials, plant, and labour are available when needed without excess inventory or idle time.

Aligning Activities with Material Requirements

  • Material Quantification: Using Bills of Quantities (BoQ), materials needed for each activity are quantified to avoid shortages or overstocking at sites like county government offices.
  • Lead Time Considerations: Procurement lead times influence scheduling to ensure materials arrive before the activity starts, mitigating delays.
  • Storage and Handling Planning: Scheduling must consider material storage capacity on site to prevent damage or theft, especially in urban projects.
  • Material Delivery Scheduling: Coordinating deliveries with activity timelines reduces congestion and handling costs.
  • Waste Minimization: Proper scheduling limits excess material ordering, reducing wastage and cost overruns.

Coordinating Plant and Equipment Usage

  • Plant Availability Matching: Scheduling activities according to plant availability avoids idle equipment and rental costs, critical in SACCO office constructions where budget control is stringent.
  • Maintenance Scheduling: Plant maintenance periods must be integrated into the schedule to prevent unexpected breakdowns.
  • Multiple Use Planning: Efficient scheduling allows the same plant to be used across different activities, optimizing resource use.
  • Safety and Site Access: Plant scheduling considers site layout and safety regulations, ensuring smooth operation without hazards.
  • Contingency Planning: Backup plant arrangements are scheduled to handle equipment failure or delays.

Labour Scheduling in Relation to Activities

  • Skill Matching: Labour resources are scheduled based on the skills required for each activity, such as skilled masons for walling or electricians for wiring in university projects.
  • Labour Availability: Local labour market conditions in Kenya influence scheduling, with considerations for labour laws and union agreements.
  • Shift Planning: Scheduling work shifts to maximize productivity while adhering to legal limits on working hours.
  • Labour Productivity Rates: Incorporating realistic productivity rates into schedules prevents unrealistic timelines and cost estimates.
  • Training and Supervision: Scheduling time for worker training and supervision ensures quality and safety compliance.

4.1.4 Challenges in Defining Project Activities and Mitigation Strategies

Accurately defining project activities is not without challenges, which can impact the quality of the material, plant, and labour schedules. Recognizing and addressing these challenges is vital for Quantity Surveyors to maintain project control.

Common Challenges

  • Incomplete or Ambiguous Scope Documents: Projects with poorly defined scopes lead to missing or overlapping activities, causing scheduling conflicts.
  • Changing Client Requirements: Scope changes during construction disrupt established activity schedules and resource plans.
  • Unforeseen Site Conditions: Discoveries like poor soil conditions require additional activities, affecting original schedules.
  • Coordination Difficulties: Multiple contractors and suppliers complicate activity alignment and resource sharing.
  • Data Collection Limitations: Inaccurate or delayed information on progress or resource availability hampers schedule updates.

Mitigation Strategies

  • Thorough Scope Review: Engaging in detailed scope analysis and clarifications during tendering minimizes ambiguity.
  • Change Management Procedures: Implementing formal processes for handling scope changes helps integrate new activities systematically.
  • Contingency Planning: Allocating buffers for unexpected site conditions reduces schedule disruptions.
  • Stakeholder Coordination Meetings: Regular forums for contractors, suppliers, and clients improve communication and alignment.
  • Use of Project Management Software: Tools like Primavera or MS Project enhance data accuracy and real-time schedule adjustments.

Practice Questions

  1. Explain the importance of breaking down project scope into distinct activities in the preparation of a material, plant, and labour schedule. (10 marks)

  2. Describe five characteristics of project activities and explain how each influences the scheduling process. (15 marks)

  3. Discuss how a Work Breakdown Structure (WBS) supports Quantity Surveyors in managing construction project activities. (10 marks)

  4. Identify and explain five challenges faced when defining project activities in Kenyan construction projects and suggest mitigation measures. (15 marks)

  5. How can the sequencing of project activities affect the allocation of plant and labour resources? Use examples from a public sector construction project. (10 marks)

The rest of this chapter
🔒

Create a free account to open more of this chapter.

Free: practical guides, quick cards, workplace scenarios and more.

Create a free account
🔒4.2 Material requirements based on the project activities

In quantity surveying, accurately determining material requirements based on project activities is fundamental to cost control, procurement planning, and schedule adherence. In the Kenyan construction industry, where projects often face challenges such as fluc…

🔒4.3 Labour requirements based on the project activities

In quantity surveying, accurately determining labour requirements is crucial for effective project planning and cost control. Labour scheduling ensures that the right number of skilled and unskilled workers are available at the right time to maintain project t…

🔒4.4 Plant requirements based on the project activities

In quantity surveying, accurate planning of plant requirements is essential to ensure smooth construction progress and cost control. Plant refers to the machinery and equipment necessary to execute various project activities, ranging from excavation to finishi…

Chapter Summary

This chapter focused on preparing schedules for materials, plant, and labour by first identifying the specific project activities derived from the project scope. Understanding these activities is essential for determining the precise material requirements necessary to complete each task effectively. The chapter then examined how to assess labour needs based on the nature and complexity of the project activities, ensuring the right skills and workforce size are allocated. Following this, plant requirements were considered, emphasizing the selection and scheduling of appropriate equipment to support the project activities efficiently. Each element, materials, labour, and plant, must be coordinated to align with the project timeline and scope to avoid delays and cost overruns. The integration of these schedules forms a comprehensive plan that supports smooth project execution and resource management. Overall, the chapter provided a systematic approach to organizing the key resources essential for successful construction project management.

Self-Assessment

🔒 PDFDownload this self-assessment, with answers

A. Written Assessment

  1. Define project scope and explain its importance in preparing a material schedule. (4 marks)
  2. Which of the following is NOT typically considered when determining material requirements?
    a) Project activities
    b) Labour skills
    c) Project timeline
    d) Material specifications (2 marks)
🔒20 more in this section.

Chapter Examination Questions

🔒 PDFDownload these examination questions, with worked answers

SECTION A (40 Marks) - Answer ALL Questions

  1. Explain how the project scope influences the identification of project activities in a building construction project at a county government office. (4 marks)
  2. Identify four key material categories a quantity surveyor would schedule for a residential housing project and explain why each is critical. (4 marks)
🔒18 more in this section.
Flashcards 20 cards Study deck ▾
Question
1

↻ Tap card to reveal answer
🔒

18 more in this section.

Create a free account
Test Yourself 16 questions Start quiz ▾
0%
0 / 2
🔒

14 more in this section.

Create a free account
Am I competent?

At the start of this chapter we promised you would be able to:

  • determine project evaluation criteria by following standard operating procedures accurately.
  • carry out a financial evaluation using the project budget correctly.
  • evaluate performance standards by applying the correct procedures.
  • prepare a clear and detailed project evaluation report following the right steps.
  • conduct a thorough site inspection based on the project scope.

Tick each one you can genuinely do.