Quantity Survey  ·  Level 6
Civil Engineering Works
Chapter 8: Construct tunnels
📚 6 Topics
⚑ What you will be able to do

By the end of this chapter, you will be able to:

  • Identify the different functions of tunnels based on the needs of your tunnel construction project.
  • Choose the right type of tunnel by considering site conditions, how the tunnel will be used, and design requirements.
  • Conduct a thorough feasibility study for tunnel construction while following all standard procedures and regulations.
  • Perform drilling operations safely and accurately using the approved method for tunnel construction.
  • Build tunnels according to the approved designs, specifications, and standard operating procedures.
  • Apply tunnel waterproofing correctly by following project specifications and manufacturer’s instructions.

Mastering these skills will help you build strong, safe tunnels that meet project goals and stand the test of time in the civil engineering trade.

Constructing tunnels is a specialized aspect of civil engineering that requires precise planning, design, and execution. For quantity surveyors in Kenya, understanding tunnels extends beyond construction techniques to include cost management, risk assessment, and contract administration. Tunnels serve critical infrastructure needs by enabling transport, utilities, and water management in urban and rural settings. This chapter focuses on the fundamental functions of tunnels, providing a foundation for quantity surveyors to evaluate project scope, prepare accurate bills of quantities, and advise on cost implications effectively.

8.1 Functions of Tunnels

In Kenya, tunnels are increasingly important for overcoming geographical barriers like hills, rivers, and urban congestion. Quantity surveyors must appreciate the variety of functions tunnels serve to align budgeting and procurement with project objectives. The functional purpose of a tunnel influences design complexity, material requirements, and timelines, all of which impact cost planning and risk mitigation strategies.

8.1.1 Enabling Transportation Networks

Tunnels primarily facilitate the uninterrupted movement of people and goods by providing alternative routes beneath natural or man-made obstacles. For example, in Nairobi, a proposed tunnel under the railway line could alleviate traffic congestion by connecting key suburbs without disrupting surface transport. This function supports economic growth by reducing travel time and vehicle operating costs.

Key Aspects of Transportation Tunnels

  • Traffic Decongestion: By diverting vehicles underground, tunnels reduce surface congestion, improving urban mobility and lowering pollution.
  • Connectivity Enhancement: Tunnels link isolated areas, fostering regional development and access to markets, schools, and hospitals.
  • Safety Improvement: Underground passage reduces accident risks associated with steep or narrow surface roads, especially in hilly regions like Kisii.
  • Environmental Protection: Tunnels preserve surface ecosystems by minimizing the need for road widening or deforestation.
  • Public Transit Support: Dedicated tunnels for rail or bus rapid transit systems provide efficient mass transit solutions, supporting Kenya’s Vision 2030 urban transport goals.

8.1.2 Facilitating Utility Services

Tunnels serve as conduits for essential utilities including water supply, sewage, electricity, and telecommunications. In large urban centers such as Mombasa, underground tunnels protect utility lines from damage and theft, ensuring reliable service delivery. Quantity surveyors must consider specialized lining, access shafts, and safety provisions when estimating such projects.

Utility Functions of Tunnels

  • Water Conveyance: Tunnels transport potable water from dams or treatment plants to urban centers while preventing contamination and evaporation losses.
  • Sewage and Drainage: Underground tunnels channel wastewater safely to treatment facilities, reducing flood risks in flood-prone counties like Kisumu.
  • Power Transmission: Electrical cables laid in tunnels avoid exposure to weather and vandalism, enhancing grid reliability.
  • Telecommunication Networks: Fiber optic cables installed in tunnels ensure secure and high-speed data transmission critical for banking and government operations.
  • Maintenance Access: Utility tunnels provide safe routes for inspection and repairs, minimizing service disruptions.

8.1.3 Supporting Water Management and Flood Control

In regions vulnerable to seasonal flooding and waterlogging, tunnels contribute to effective water management by diverting excess water away from populated areas. For instance, in Nairobi’s informal settlements, underground drainage tunnels can alleviate flooding caused by inadequate surface drainage. This function is vital for protecting infrastructure and reducing health hazards.

Water Management Roles of Tunnels

  • Flood Diversion: Tunnels redirect stormwater runoff to rivers or reservoirs, preventing urban flooding during heavy rains.
  • Groundwater Control: Subsurface tunnels help regulate water table levels, protecting foundations of buildings and roads.
  • Irrigation Supply: Tunnels can channel water to agricultural zones, supporting consistent crop production in arid counties like Turkana.
  • Reservoir Interconnection: Linking multiple water storage sites via tunnels balances supply and demand efficiently.
  • Emergency Spillways: Tunnels serve as overflow channels in dams and reservoirs, ensuring structural safety during extreme weather events.

8.1.4 Enabling Mining and Resource Extraction

Tunnels provide access to underground mineral deposits and resources, allowing extraction while minimizing environmental footprint. In Kenya’s mining regions such as Kwale and Kerio Valley, tunnels facilitate the safe and efficient removal of minerals like titanium and fluorspar. Quantity surveyors working on mining infrastructure projects must account for specialized excavation methods and safety standards.

Mining and Resource Extraction Functions

  • Access to Ore Bodies: Tunnels allow miners to reach deposits deep beneath the surface with minimal disturbance.
  • Ventilation Pathways: Properly designed tunnels ensure fresh air circulation for underground workers, enhancing safety.
  • Transport Routes: Tunnels facilitate the movement of extracted materials to processing plants or storage areas.
  • Water Control: Drainage tunnels prevent flooding in mines, protecting equipment and personnel.
  • Support Infrastructure: Service tunnels house power lines, communication cables, and emergency exits essential for mining operations.

Practice Questions

  1. Explain five key functions of tunnels in urban transportation and how they impact project cost planning. (10 marks)
  2. Describe the role of tunnels in utility service delivery and outline five considerations a quantity surveyor must account for in such projects. (10 marks)
  3. Discuss the importance of tunnels in water management and flood control within Kenyan urban areas, providing five specific functions. (10 marks)
  4. Identify and explain five functions of tunnels in mining operations and how these influence the scope of quantity surveying. (10 marks)
The rest of this chapter
🔒

Create a free account to open more of this chapter.

Free: practical guides, quick cards, workplace scenarios and more.

Create a free account
🔒8.2 Types of Tunnels

In the Kenyan construction and infrastructure sector, quantity surveyors are increasingly involved in projects that require detailed understanding of tunnel types. Tunnels form essential components in urban transport, water supply, and mining projects, especia…

🔒8.3 Feasibility Study

In the context of quantity surveying for civil engineering works such as tunnel construction, a feasibility study is a critical preliminary step. It assesses whether the proposed tunnel project is viable economically, technically, legally, and environmentally…

🔒8.4 Drilling of Tunnels

Drilling is a critical phase in tunnel construction, particularly for quantity surveyors who must assess costs, timelines, and resource allocation accurately. In Kenya, where diverse geological conditions prevail, from Nairobi's soft soils to the rocky terrain…

🔒8.5 Tunnel Constructions

Tunnel construction is a critical aspect of civil engineering projects that involve creating underground passages for transport, utilities, or mining. For quantity surveyors in Kenya, understanding the methods and materials involved in tunnel construction is e…

🔒8.6 Tunnel Waterproofing

Tunnel waterproofing is a critical aspect of civil engineering works, particularly in Kenya where varying climatic conditions and groundwater levels pose challenges to underground infrastructure. For quantity surveyors, understanding the methods, materials, an…

Chapter Summary

This chapter explored the essential functions of tunnels, highlighting their role in facilitating transportation, utility passage, and connectivity in challenging terrains. It detailed various types of tunnels, including their classification based on construction methods and geological conditions. The importance of a thorough feasibility study was emphasized to assess technical, economic, and environmental viability before commencing tunnel projects. The process of drilling tunnels was examined, focusing on techniques and equipment suitable for different ground conditions. Tunnel construction methods were discussed, covering the stages from excavation to support installation. Finally, the chapter addressed tunnel waterproofing, explaining the materials and methods used to prevent water ingress and ensure structural durability. Together, these topics provide a comprehensive understanding of the complexities involved in tunnel engineering.

Self-Assessment

🔒 PDFDownload this self-assessment, with answers

A. Written Assessment

  1. What are the primary functions of tunnels in civil engineering projects? (4 marks)
  2. Identify and describe three common types of tunnels used in Kenyan infrastructure projects. (6 marks)
🔒20 more in this section.

Chapter Examination Questions

🔒 PDFDownload these examination questions, with worked answers

SECTION A (40 Marks) - Answer ALL Questions

  1. Explain five primary functions of tunnels in infrastructure development within Kenya. (4 marks)
  2. Differentiate between the main types of tunnels used in civil engineering projects. (4 marks)
🔒18 more in this section.

Chapter Practical Activities

Practical 1: Identify tunnel functions and types using models or samples

Quantity Survey · Level 6
Civil Engineering Works
PRACTICAL ASSESSMENT
TIME: 3 HOURS
⬇ PDFCandidate Instructions (Candidate Tool)

Type: Individual

INSTRUCTIONS TO CANDIDATE:
1.  You are required to perform the following task:
i.  Classify and explain at least four different tunnel functions and four types of tunnels using the provided models or samples.
2.  You have been provided with the following resources for the practical task:
Tools & EquipmentMaterials
Measuring TapeTunnel Function and Type Models or Samples
Pen
Notebook
⬇ PDFResources Required (Cutting List)
S/NItemQuantity
1Safety Helmet1 Pc per Candidate
2Safety Boots1 Pair per Candidate
3Reflective Jacket1 Pc per Candidate
4Tunnel Function and Type Models or Samples1 Set per Candidate
5Measuring Tape (5m)1 Pc per Candidate
6Pen and Notebook1 Set per Candidate
⬇ PDFAssessor Guide
Items to be EvaluatedMarks AvailableMarks ObtainedComments
TASK 1: IDENTIFICATION AND EXPLANATION OF TUNNEL FUNCTIONS
Identified and used appropriate PPEs (Helmet, Safety Boots, Reflective Jacket)
(Award 1 mark for each correct PPE worn)
3
Assembled and prepared models or samples for demonstration
(Award 2 marks for correct assembly and preparation)
2
Correctly identified at least four functions of tunnels (e.g., transportation, water conveyance, mining, utilities)
(Award 1 mark for each correctly identified function)
4
Clearly explained each tunnel function in context
(Award 1 mark for each clear explanation)
4
Used measuring tape to measure model dimensions where applicable
(Award 2 marks for accurate use of measuring tape)
2
Recorded observations and explanations clearly in notebook
(Award 2 marks for clear and complete records)
2
Sub-Total17
TASK 2: IDENTIFICATION AND EXPLANATION OF TUNNEL TYPES
Correctly identified at least four types of tunnels (e.g., cut-and-cover, bored tunnel, immersed tunnel, drill and blast)
(Award 1 mark for each correctly identified tunnel type)
4
Explained characteristics and typical uses of each tunnel type
(Award 1 mark for each clear explanation)
4
Demonstrated understanding by pointing out features on models or samples
(Award 3 marks for clear demonstration)
3
Answered assessor’s questions related to functions and types confidently
(Award 3 marks for confident and correct answers)
3
Sub-Total14
PRODUCT CHECKLIST
Complete and accurate classification of tunnel functions and types with clear explanations
(Award up to 10 marks based on completeness, accuracy, and clarity)
10
Sub-Total10
GRAND TOTAL41
ASSESSMENT OUTCOME:   ☐ Competent    ☐ Not Yet Competent (competent if at least 50%)

Practical 2: Conduct feasibility study for tunnel construction

Quantity Survey · Level 6
Civil Engineering Works
PRACTICAL ASSESSMENT
TIME: 5 HOURS
⬇ PDFCandidate Instructions (Candidate Tool)

Type: Individual

INSTRUCTIONS TO CANDIDATE:
1.  You are required to perform the following task:
i.  Conduct a detailed feasibility study report for a 50m long tunnel construction based on site survey and environmental assessment.
2.  You have been provided with the following resources for the practical task:
Tools & EquipmentMaterials
Helmet
Safety boots
Reflective jacket
Geological hammer
Measuring tape (5m)
Handheld GPS device
Soil auger
Field notebook and pens
Environmental checklist forms
Camera or smartphone
⬇ PDFResources Required (Cutting List)
S/NItemQuantity
1Helmet1 Pc per Candidate
2Safety boots1 Pair per Candidate
3Reflective jacket1 Pc per Candidate
4Geological hammer1 Pc per Candidate
5Measuring tape (5m)1 Pc per Candidate
6Handheld GPS device1 Pc per Candidate
7Soil auger1 Pc per Candidate
8Field notebook and pens1 Set per Candidate
9Environmental checklist forms1 Set per Candidate
10Camera or smartphone for photo documentation1 Pc per Candidate
⬇ PDFAssessor Guide
Items to be EvaluatedMarks AvailableMarks ObtainedComments
TASK 1: SITE SURVEY AND DATA COLLECTION
Identified and used appropriate PPE including helmet, safety boots, and reflective jacket
(Award 1 mark each for helmet, boots, reflective jacket)
3
Assembled and prepared tools and materials for site survey
(Award 0.5 marks each for assembling at least four correct tools)
2
Conducted geological survey using geological hammer and soil auger correctly
(Award 1 mark each for correct hammer use, soil auger use, sampling method, and safety)
4
Measured and recorded site dimensions and GPS coordinates accurately
(Award 1 mark each for measuring length, width, and correct GPS reading)
3
Completed environmental checklist form accurately based on site observations
(Award 1 mark each for identifying vegetation, water sources, and potential hazards)
3
Photographed key site features relevant to tunnel feasibility
(Award 2 marks for clear and relevant photographic documentation)
2
Recorded all data legibly and systematically in field notebook
(Award 3 marks for completeness, legibility, and organization)
3
Sub-Total20
TASK 2: ANALYSIS AND REPORT PREPARATION
Analyzed geological data to assess rock type suitability for tunneling
(Award 5 marks for correct identification and assessment)
5
Evaluated environmental factors impacting tunnel construction feasibility
(Award 5 marks for thorough evaluation including water table, vegetation, hazards)
5
Prepared a structured feasibility study report including recommendations
(Award 10 marks for clear, concise, and complete report with conclusions)
10
Sub-Total20
PRODUCT CHECKLIST
Feasibility study report covering site survey data, geological and environmental analysis, and clear recommendations
(Award 10 marks for completeness, accuracy, and presentation quality)
10
Sub-Total10
GRAND TOTAL50
ASSESSMENT OUTCOME:   ☐ Competent    ☐ Not Yet Competent (competent if at least 50%)
🔒

Free: practical guides, quick cards, workplace scenarios and more.

Create a free account
🔒Set Out Tunnel Alignment and Profiles Using Surveying InstrumentsPractical 3
🔒Perform tunnel drilling operations for pilot hole excavationPractical 4
🔒Excavate a 3m long tunnel section manually according to safety standardsPractical 5
🔒Install steel rib tunnel support structure as per specificationPractical 6
🔒Apply waterproofing membranes on tunnel surfacesPractical 7
🔒Seal Tunnel Joints and Cracks for WaterproofingPractical 8
🔒Inspect and test tunnel waterproofing effectivenessPractical 9
🔒Prepare a detailed tunnel construction work planPractical 10
Flashcards 20 cards Study deck ▾
Question
1

↻ Tap card to reveal answer
🔒

18 more in this section.

Create a free account
Test Yourself 19 questions Start quiz ▾
0%
0 / 2
🔒

17 more in this section.

Create a free account
Am I competent?

At the start of this chapter we promised you would be able to:

  • Identify the different functions of tunnels based on the needs of your tunnel construction project.
  • Choose the right type of tunnel by considering site conditions, how the tunnel will be used, and design requirements.
  • Conduct a thorough feasibility study for tunnel construction while following all standard procedures and regulations.
  • Perform drilling operations safely and accurately using the approved method for tunnel construction.
  • Build tunnels according to the approved designs, specifications, and standard operating procedures.
  • Apply tunnel waterproofing correctly by following project specifications and manufacturer’s instructions.

Tick each one you can genuinely do.

So, are you there yet?

You're competent when you can confidently do 50% or more of what this chapter promised.

Sign in to record how you're doing.