Civil Engineering  ·  Level 6
Waste Water Infrastructure Design
Chapter 2: Conduct Engineering Survey
📚 4 Topics
⚑ What you will be able to do

By the end of this chapter, you will be able to:

  • Wear the correct personal protective equipment safely, following the OSH Act 2010 procedures.
  • Identify and select the right survey tools and equipment based on site conditions and the data you need.
  • Carry out an engineering survey accurately and confidently according to job requirements.
  • Prepare a clear and correct engineering survey report following your workplace policies.

Mastering these skills ensures you can contribute to designing safe and effective wastewater infrastructure, making a real difference in your community.

Compiled by: Simon Githaiga

Civil engineers involved in wastewater infrastructure design frequently conduct field surveys to gather critical data that informs their project planning and execution. Such surveys expose them to various physical hazards including heavy equipment, sharp objects, and chemical contaminants present in wastewater environments. Therefore, adherence to personal protective equipment (PPE) protocols is essential to safeguard health and safety on site, ensuring uninterrupted progress and compliance with occupational safety regulations in Kenya.

2.1 PPEs

Personal Protective Equipment (PPE) forms the first line of defense for civil engineers and survey teams working in challenging environments such as wastewater infrastructure sites. Proper selection and use of PPE minimizes the risk of injury and exposure to harmful substances, which is critical given Kenya’s strict regulatory framework on occupational health managed by bodies like the Directorate of Occupational Safety and Health Services (DOSHS). The components of PPE covered here include overalls, hardhats, safety goggles, gloves, safety boots, and welding goggles, each with specific roles and standards.

2.1.1 Overalls

Overalls provide comprehensive body protection for surveyors and engineers working in wastewater projects, shielding against dirt, chemical splashes, and abrasions.

Material Composition and Durability

Overalls are typically made from heavy-duty cotton or polyester blends treated for water resistance and chemical repellence. These materials ensure durability under frequent exposure to wet and polluted conditions common in sewer line surveys in Nairobi or Kisumu.

Design Features for Safety and Comfort

Features such as reinforced seams, adjustable cuffs, and multiple pockets allow for ease of movement while securing tools and minimizing snag risks. Ventilation openings or breathable fabrics are incorporated to reduce heat stress during prolonged fieldwork under the equatorial sun.

Compliance with Safety Standards

Kenyan safety regulations require overalls to meet minimum standards such as ISO 13688 for protective clothing, ensuring adequate resistance to chemical penetration and mechanical hazards. Contractors working on county government wastewater projects must verify PPE compliance during procurement.

Maintenance and Hygiene Practices

Maintaining overalls involves regular washing with appropriate detergents to remove contaminants, inspecting for tears or wear, and prompt replacement when integrity is compromised. This prevents cross-contamination and protects workers from pathogen exposure.

2.1.2 Hardhat

The hardhat is a vital protective headgear designed to prevent injuries from falling objects, bumps, and electrical hazards during survey operations around construction and maintenance sites.

Construction and Impact Resistance

Hardhats are constructed from high-density polyethylene (HDPE) or fiberglass to provide robust impact resistance. The suspension system inside absorbs shocks, reducing the risk of skull fractures during accidental falls or debris impact.

Types and Classifications

There are various classes of hardhats recognized internationally and locally: Class G (general use), Class E (electrical insulation), and Class C (conductive). For wastewater infrastructure sites, Class E hardhats offer protection against electrical hazards from underground cables or energized equipment.

Fit and Adjustment Mechanisms

Adjustable straps and suspension bands ensure the hardhat fits securely on different head sizes, preventing displacement during movement. Proper fit is essential to maintain protection, particularly when climbing ladders or working in confined spaces.

Inspection and Replacement Criteria

Daily inspection of the hardhat for cracks, dents, or degradation is mandatory. Kenyan safety protocols recommend replacing hardhats every 2 to 5 years or immediately after a significant impact to maintain effectiveness.

2.1.3 Safety Goggles

Safety goggles protect surveyors’ eyes from chemical splashes, dust, and flying debris encountered in wastewater infrastructure environments.

Types of Safety Goggles

Goggles come in indirect vented, direct vented, and non-vented types, each suited to different hazards. Indirect venting, for example, prevents liquid ingress while allowing airflow, ideal for chemical handling at treatment plants.

Lens Materials and Coatings

Polycarbonate lenses are preferred for their impact resistance and optical clarity. Anti-fog and scratch-resistant coatings enhance visibility and durability during extended use in humid or dusty conditions typical of Kenyan fieldwork.

Fit and Seal Integrity

A tight seal around the eyes is crucial to prevent contaminants from entering. Adjustable straps and flexible frames accommodate various face shapes and sizes to maintain comfort without compromising protection.

Cleaning and Storage

Regular cleaning with mild soap and water removes residues that could impair vision or degrade lens coatings. Goggles should be stored in protective cases away from direct sunlight to prolong lifespan.

2.1.4 Gloves

Material Selection Based on Hazard Type

Nitrile gloves provide excellent chemical resistance, particularly against oils and solvents, while leather gloves protect against mechanical injuries like abrasions and punctures. Latex gloves are commonly used for biological protection but may cause allergies for some users.

Sizing and Dexterity Considerations

Proper glove sizing is essential to maintain tactile sensitivity and manual dexterity required for handling instruments such as GPS devices and sampling bottles. Oversized gloves can be unsafe by impairing grip, while undersized gloves cause discomfort and reduce circulation.

Durability and Reusability

Heavy-duty gloves designed for fieldwork are often reusable but require routine inspection for holes or thinning. Single-use gloves are preferred when contamination risk is high, such as during pathogen sampling in hospital wastewater.

Disposal and Hygiene Protocols

Used disposable gloves must be discarded in designated biohazard bins to prevent environmental contamination. Workers are trained to avoid cross-contamination by changing gloves between tasks and washing hands thoroughly afterward.

2.1.5 Safety Boots

Safety boots protect feet from punctures, crushing injuries, and chemical spills encountered on uneven or debris-laden wastewater infrastructure sites.

Four types of safety footwear commonly used in construction and engine
Four types of safety footwear commonly used in construction and engine (Source: INSTALL DRAINAGE SYSTEM NOTES )

Construction and Protective Features

Safety boots typically feature steel or composite toe caps to guard against impact injuries, along with puncture-resistant midsoles. Slip-resistant soles provide traction on wet or oily surfaces common in treatment plants.

Material and Comfort

Leather uppers offer durability and water resistance, while breathable linings improve comfort during long hours in the field. Some boots incorporate insulation for cold environments or metatarsal guards for additional protection.

Compliance with Kenyan Safety Standards

Boots must conform to standards such as KEBS KS 2456:2017, ensuring adequate protection levels for civil engineering field activities. Employers are responsible for verifying PPE certification during procurement.

Maintenance and Inspection

Regular cleaning removes mud and corrosive agents, while inspections check for sole wear or damage that could compromise safety. Timely replacement maintains protective performance and worker safety.

2.1.6 Welding Goggles

Welding goggles shield the eyes from intense light, sparks, and ultraviolet radiation during welding or cutting tasks often encountered in wastewater infrastructure repair or fabrication.

Name Specification Use
Welding Goggles Darkened lenses with UV protection Protect eyes during welding activities
  • Welding goggles have lenses with variable shading levels to filter harmful ultraviolet and infrared rays that can cause "arc eye" or retinal damage.
  • The goggles must fit snugly to prevent sparks from entering from the sides during welding on site.
  • Maintenance involves cleaning lenses after each use and storing goggles in a protective case to avoid scratches that impair visibility.
  • Workers should ensure goggles meet ANSI Z87.1 standards or equivalent Kenyan safety requirements for eye protection in welding.

Practice Questions

  1. Explain the importance of wearing overalls during wastewater infrastructure surveys and list four essential features that enhance their effectiveness. (10 marks)

  2. Describe the different classes of hardhats and identify which class is most suitable for surveyors working near electrical hazards. Justify your choice. (10 marks)

  3. Discuss the key considerations when selecting gloves for wastewater sampling activities. (10 marks)

  4. Outline the maintenance practices required to ensure safety boots provide continuous protection on field sites. (10 marks)

  5. Explain why welding goggles are necessary during wastewater infrastructure repairs involving metalwork and describe their key protective features. (10 marks)

The rest of this chapter
🔒

Create a free account to open more of this chapter.

Free: practical guides, quick cards, workplace scenarios and more.

Create a free account
🔒2.2 Survey tools and equipment

GIS (Geographic Information System) software is computer software used to capture, store, analyse and display data that is linked to locations on the earth’s surface. In surveying, GIS software is used to bring together field survey data, satellite images, map…

🔒2.3 Engineering survey

A topographical survey is a survey that locates and records the natural and man-made features of an area together with the shape and height of the ground, and presents them on a topographic map or plan with contours and spot heights. It is usually the first su…

🔒2.4 Engineering Survey Report

The engineering survey report is a formal document that consolidates survey data, analysis, and recommendations. It serves as a reference for engineers, contractors, and stakeholders throughout the wastewater infrastructure project lifecycle. In Kenya, such re…

Chapter Summary

This chapter covered essential personal protective equipment used during engineering surveys, including overalls, hardhats, safety goggles, gloves, safety boots, and welding goggles, each designed to ensure safety in different site conditions. It then explored various survey tools and technologies such as GIS software, RTK and RTX positioning systems, theodolites, dumpy levels, total stations, levelling staffs, and booking sheets, highlighting their roles in accurate data collection. The chapter distinguished between topographical surveys, which focus on mapping the natural and man-made features of land, and construction surveys that provide precise measurements necessary for building activities. Finally, it emphasized the importance of compiling a comprehensive engineering survey report that documents findings, measurements, and observations to guide subsequent design and construction phases.

Self-Assessment

🔒 PDFDownload this self-assessment, with answers

A. Written Assessment

  1. Which personal protective equipment (PPE) is specifically designed to protect the eyes from flying debris during welding? (2 marks)
  2. Describe two key functions of a total station in engineering surveys. (4 marks)
🔒20 more in this section.

Chapter Examination Questions

🔒 PDFDownload these examination questions, with worked answers

SECTION A (40 Marks) - Answer ALL Questions

  1. Explain why wearing overalls is important for civil engineers conducting field surveys on wastewater infrastructure projects in Nairobi County. (4 marks)
  2. Describe the primary function of a hardhat during engineering surveys at construction sites such as those managed by KeNHA. (4 marks)
🔒18 more in this section.

Chapter Practical Activities

Practical 1: Operate Theodolite to Measure Horizontal and Vertical Angles for Site Survey

Civil Engineering · Level 6
Waste Water Infrastructure Design
PRACTICAL ASSESSMENT
TIME: 4 HOURS
⬇ PDFCandidate Instructions (Candidate Tool)

Type: Individual

INSTRUCTIONS TO CANDIDATE:
1.  You are required to perform the following task:
i.  Set up and operate a theodolite to measure and record horizontal and vertical angles between three fixed points on site within ±1 minute accuracy.
2.  You have been provided with the following resources for the practical task:
Tools & EquipmentMaterials
Theodolite
Tripod Stand
Plumb Bob
Measuring Tape 30 m
Adjustable Wrench
Field Notebook and Pen
⬇ PDFResources Required (Cutting List)
S/NItemQuantity
1Theodolite1 Pc per Candidate
2Tripod Stand1 Pc per Candidate
3Plumb Bob1 Pc per Candidate
4Measuring Tape 30 m1 Pc per Candidate
5Field Notebook and Pen1 Set per Candidate
6PPE (Safety Boots, Overall, Gloves)1 Set per Candidate
7Adjustable Wrench1 Pc per Candidate
⬇ PDFAssessor Guide
Items to be EvaluatedMarks AvailableMarks ObtainedComments
TASK 1: Setup and Operation of Theodolite
Wore prescribed PPE (Safety boots, Overall, Gloves)
(Award 3 marks or zero)
3
Correctly assembled and leveled the theodolite on tripod
(Award 4 marks or zero)
4
Used plumb bob to center the instrument exactly over the survey point
(Award 3 marks or zero)
3
Calibrated the theodolite before taking measurements
(Award 3 marks or zero)
3
Measured horizontal angles between three fixed points accurately
(Award 2 marks each for 3 angles, total 6 marks)
6
Measured vertical angles to two points with correct instrument handling
(Award 2 and 3 marks respectively or zero)
5
Recorded all measurements legibly and correctly in the field notebook
(Award 3 marks or zero)
3
Sub-Total27
PRODUCT CHECKLIST
Horizontal angles measured within ±1 minute accuracy
(Award 2 marks each for 3 angles within tolerance)
6
Vertical angles measured within ±1 minute accuracy
(Award 2 and 3 marks for 2 vertical angles within tolerance)
5
All recorded data complete, clear, and consistent
(Award 4 marks or zero)
4
Sub-Total15
GRAND TOTAL42
ASSESSMENT OUTCOME:   ☐ Competent    ☐ Not Yet Competent (competent if at least 50%)

Practical 2: Conduct Levelling to Determine Height Differences Between Survey Points

Civil Engineering · Level 6
Waste Water Infrastructure Design
PRACTICAL ASSESSMENT
TIME: 4 HOURS
⬇ PDFCandidate Instructions (Candidate Tool)

Type: Individual

INSTRUCTIONS TO CANDIDATE:
1.  You are required to perform the following task:
i.  Conduct levelling using a dumpy level and levelling staff to determine the height difference between four survey points spaced 15 meters apart.
2.  You have been provided with the following resources for the practical task:
Tools & EquipmentMaterials
Dumpy level
Levelling staff
Tripod stand
5 m tape measure
Plumb bob
Marker pegs
Notebook and pen
⬇ PDFResources Required (Cutting List)
S/NItemQuantity
1Dumpy level1 Pc per Candidate
2Levelling staff1 Pc per Candidate
3Tripod stand1 Pc per Candidate
45 m tape measure1 Pc per Candidate
5Notebook and pen1 Set per Candidate
6PPE (Safety boots, Overall, Gloves)1 Set each per Candidate
7Plumb bob1 Pc per Candidate
8Marker pegs4 Pcs per Candidate
⬇ PDFAssessor Guide
Items to be EvaluatedMarks AvailableMarks ObtainedComments
TASK 1: Preparation and Setup
Wore prescribed PPE (Safety boots, Overall, Gloves)
(Award 3 marks or zero)
3
Set up tripod and mounted dumpy level correctly
(Award 3 marks or zero)
3
Leveled the dumpy level instrument accurately
(Award 4 marks or zero)
4
Used plumb bob to ensure instrument is centered over benchmark or reference point
(Award 2 marks or zero)
2
Sub-Total12
TASK 2: Levelling and Measurement
Positioned levelling staff correctly on each survey point
(Award 3 marks or zero)
3
Read and recorded staff readings accurately to nearest millimeter
(Award 1 mark each for 5 correct readings)
5
Calculated height differences correctly between points
(Award 5 marks or zero)
5
Used 5 m tape measure to verify distances between survey points
(Award 3 marks or zero)
3
Sub-Total16
TASK 3: Site Management and Documentation
Placed marker pegs at survey points securely
(Award 2 marks or zero)
2
Maintained neat and clear field notes in notebook
(Award 3 marks or zero)
3
Cleared site of equipment and ensured no hazards remained
(Award 2 marks or zero)
2
Sub-Total7
PRODUCT CHECKLIST
Height difference measurements between points accurate within ±3mm tolerance
(Award 5 marks or zero)
5
Distances between survey points measured as 15,000 ± 50 mm each
(Award 4 marks or zero)
4
Field notes complete, legible, and correctly tabulated
(Award 4 marks or zero)
4
Sub-Total13
GRAND TOTAL48
ASSESSMENT OUTCOME:   ☐ Competent    ☐ Not Yet Competent (competent if at least 50%)
🔒

Free: practical guides, quick cards, workplace scenarios and more.

Create a free account
🔒Use Total Station to Collect Survey Data for Waste Water Infrastructure LayoutPractical 3
🔒Perform RTK Survey to Establish Precise Coordinates of Survey PointsPractical 4
🔒Perform RTX Surveying for Waste Water Infrastructure Site LayoutPractical 5
🔒Process and Analyze Survey Data Using GIS SoftwarePractical 6
🔒Prepare Engineering Survey Report for Waste Water Infrastructure SitePractical 7
🔒Conduct Topographical Survey of a Site 50m x 40mPractical 8
🔒Set Out Building Lines and Levels for Waste Water Treatment Plant FoundationPractical 9
🔒Select and Use Welding Goggles for Eye Protection During WeldingPractical 10
🔒Selection and Use of Safety Boots and Gloves for Waste Water Infrastructure SurveyPractical 11
🔒Selection and Correct Use of Hardhat and Safety Goggles on SitePractical 12
🔒Select and Use Overalls and General PPE during Engineering SurveyPractical 13
🔒Prepare and Maintain Booking Sheet During Engineering SurveyPractical 14
🔒Set Out Site Using Theodolite and Levelling Instruments for Waste Water InfrastructurePractical 15
Flashcards 20 cards Study deck ▾
Question
1

↻ Tap card to reveal answer
🔒

18 more in this section.

Create a free account
Test Yourself 19 questions Start quiz ▾
0%
0 / 2
🔒

17 more in this section.

Create a free account
Am I competent?

At the start of this chapter we promised you would be able to:

  • Wear the correct personal protective equipment safely, following the OSH Act 2010 procedures.
  • Identify and select the right survey tools and equipment based on site conditions and the data you need.
  • Carry out an engineering survey accurately and confidently according to job requirements.
  • Prepare a clear and correct engineering survey report following your workplace policies.

Tick each one you can genuinely do.

So, are you there yet?

You're competent when you can confidently do 50% or more of what this chapter promised.

Sign in to record how you're doing.