Civil Engineering  ·  Level 6
Measurements, Estimation And Costing Principles II
Chapter 2: Abstract measured quantities
📚 5 Topics
⚑ What you will be able to do

By the end of this chapter, you will be able to:

  • Prepare an abstracting sheet correctly using the standard format.
  • Transfer descriptions of booked items to the abstracting sheet following SMM/CESMM standards.
  • Accurately transfer squared quantities to the abstracting sheet according to SMM/CESMM guidelines.
  • Calculate net quantities correctly by following SMM/CESMM procedures.
  • Run through dimensions accurately using the correct units of measurement.

Mastering these skills will help you work confidently with measurements and costing, ensuring your trade work is precise and professional.

Compiled by: Michael Githaiga

This chapter develops the skill of preparing abstract sheets for measured quantities in civil engineering projects. Abstracting consolidates detailed measurements into summaries that guide estimation and costing. Mastery of abstracting is critical for accuracy and clarity in tender documents, bills of quantities, and project cost control. The focus is on formats, organization, application of standard methods such as SMM and CESMM, and ensuring accuracy in abstracting.

2.1 Preparation of Abstracting Sheet

The preparation of an abstracting sheet is a systematic process that transforms raw measurements into organized summaries for costing and analysis. Civil engineers in Kenya working on projects ranging from county government buildings to hospitals must ensure that abstract sheets are clear, consistent, and comply with industry standards. This section breaks down the process into key aspects: abstracting formats, organizing measurements, applying SMM/CESMM standards, and reviewing for accuracy.

2.1.1 Abstracting formats

Abstracting formats define how measured quantities are arranged and presented in a sheet. Different projects and organizations may use varied formats depending on complexity and reporting requirements.

Concept and purpose

Abstracting formats provide a structured layout that enables easy reading, verification, and transfer of data. A well-chosen format reduces errors and facilitates quick identification of quantities for costing.

Common formats used in civil engineering

  1. Tabular format: Uses columns for item description, unit, quantity, and remarks. Preferred for straightforward projects.
  2. Hierarchical format: Breaks down quantities by work sections and sub-sections, useful for complex projects.
  3. Summary format: Presents only totals for each item or work category, often used in preliminary costing.
  4. Combined format: Integrates detailed quantities with summary totals on the same sheet for comprehensive review.
  5. Electronic spreadsheet format: Employs software like Excel for dynamic calculation and easy updates.

Format selection criteria

Selection depends on project complexity, client requirements, and the intended use of the abstract. For example, a county government office construction may require a hierarchical format for clarity, while a small retail shop project might use a simple tabular format.

Formatting guidelines

  • Use consistent units of measurement throughout the sheet.
  • Include clear headings and sub-headings.
  • Ensure columns are aligned for readability.
  • Leave space for cross-referencing with original measurements.
  • Use page numbering and dates for document control.

Format adaptability

Formats should be adaptable to changes during project progression. Updating the abstract should not require complete reformatting but allow incremental additions or corrections.

Worked Examples

Example 1: Prepare a simple tabular abstract format for a reinforced concrete slab with measured quantities for concrete, reinforcement, and formwork.

Given:

  • Concrete volume = 12 m³
  • Reinforcement steel = 1.5 tonnes
  • Formwork area = 80 m²
Item Description Unit Quantity Remarks
Concrete m³ 12 25 MPa grade
Reinforcement Steel tonnes 1.5 T10 bars
Formwork m² 80 Plywood sheets

Example 2: Design a hierarchical abstract format for a 2-storey office building including foundation, walls, and roofing.

Given:

  • Foundation excavation = 30 m³
  • Concrete footing = 15 m³
  • Wall plastering = 200 m²
  • Roof covering = 150 m²
Work Section Item Description Unit Quantity Remarks
1. Foundation Excavation m³ 30 Soil type C
Concrete Footing m³ 15 20 MPa grade
2. Walls Wall Plastering m² 200 Cement:sand 1:4
3. Roofing Roof Covering m² 150 Corrugated iron

Example 3: Create an electronic spreadsheet format outline for a hospital construction project abstract including columns for item codes, description, unit, quantity, rate, and amount.

Given:

  • Item codes: 101, 102, 103
  • Quantities: 100 m², 50 m³, 200 kg
  • Rates: Ksh 1500/m², Ksh 8000/m³, Ksh 150/kg
Item Code Description Unit Quantity Rate (Ksh) Amount (Ksh)
101 Floor Tiles m² 100 1500 150,000
102 Concrete m³ 50 8000 400,000
103 Reinforcement Steel kg 200 150 30,000

Practice Questions

  1. Prepare a tabular abstract format for a residential building with the following quantities: 25 m³ concrete, 2 tonnes reinforcement steel, 120 m² wall plastering. (10 marks)
  2. Design a hierarchical abstract sheet layout for a retail shop project including substructure, superstructure, and finishes with given quantities: 40 m³ excavation, 18 m³ concrete, 250 m² plastering, 100 m² roofing. (15 marks)
  3. Construct an electronic spreadsheet abstract format for a school building including columns for item code, description, unit, quantity, rate, and amount with sample data for three items. (15 marks)

2.1.2 Organizing measurements for clarity

Organizing measurements effectively in an abstract sheet ensures clarity and reduces the risk of misinterpretation or errors during estimation and costing. Kenyan civil engineers often handle large volumes of data from site measurements, requiring systematic organization.

Grouping related items

Measurements should be grouped logically by trade, work section, or material type to facilitate understanding. For example, all concrete-related quantities should be together, separate from masonry or finishing works.

Sequential arrangement

Arrange items in the order of construction activities or as per the bill of quantities sequence. This helps link the abstract to the schedule of works and simplifies cross-referencing.

Use of clear headings and subheadings

Headings and subheadings should be descriptive and consistent. They guide the reader through the abstract and help locate specific items quickly.

Consistent units and decimal places

Use uniform units of measurement throughout the abstract sheet, e.g., cubic metres for volume, square metres for area. Quantities should be rounded consistently, typically to two decimal places, to balance accuracy and readability.

Inclusion of remarks and clarifications

Remarks columns provide space to note special conditions, assumptions, or references to detailed measurements. This prevents ambiguity and supports verification.

Worked Examples

Example 1: Organize the following measurements for a county government office project into a clear abstract: 15 m³ concrete, 3 tonnes reinforcement, 120 m² wall plastering, 100 m² floor tiles.

Work Section Item Description Unit Quantity Remarks
Concrete Structural Concrete m³ 15 25 MPa grade
Reinforcement Steel Bars tonnes 3 T12 bars
Finishes Wall Plastering m² 120 Cement:sand 1:4
Finishes Floor Tiles m² 100 Ceramic tiles

Example 2: Arrange the following items sequentially by construction process: excavation 20 m³, concrete footing 10 m³, wall blockwork 300 m², plastering 280 m².

Sequence Item Description Unit Quantity Remarks
1 Excavation m³ 20 Soil type B
2 Concrete Footing m³ 10 20 MPa grade
3 Wall Blockwork m² 300 Hollow blocks
4 Wall Plastering m² 280 Cement:sand 1:4

Example 3: Organize quantities with consistent units and two decimal places: concrete 12.345 m³, steel 1.578 tonnes, plastering 85.6 m².

Item Description Unit Quantity Remarks
Concrete m³ 12.35 Rounded to 2 decimals
Reinforcement Steel tonnes 1.58 Rounded to 2 decimals
Wall Plastering m² 85.60 Rounded to 2 decimals

Practice Questions

  1. Organize the following measured quantities for a hospital project into a clear abstract sheet: 40 m³ excavation, 20 m³ concrete, 5 tonnes reinforcement, 150 m² plastering. Use logical grouping and headings. (15 marks)
  2. Arrange these items sequentially by construction process for a retail shop: 25 m³ excavation, 15 m³ concrete footing, 220 m² wall blockwork, 200 m² plastering. (10 marks)
  3. Convert and organize the following measurements with consistent units and rounding to two decimal places: concrete 10.876 m³, steel 2.345 tonnes, plastering 90.456 m². (10 marks)

2.1.3 Applying SMM/CESMM standards

The Standard Method of Measurement (SMM) and Civil Engineering Standard Method of Measurement (CESMM) provide internationally recognized frameworks for measurement and abstracting. Kenyan civil engineers adopt these standards to ensure uniformity and compliance in project documentation.

Purpose of SMM and CESMM

SMM and CESMM standardize the description, measurement, and presentation of civil engineering works. They reduce ambiguity, facilitate tendering, and improve communication between contractors and clients.

Key features of SMM

  1. Itemization: Work is divided into clearly defined items.
  2. Units: Standard units are prescribed for each item type.
  3. Measurement rules: Detailed instructions on how to measure different works.
  4. Descriptions: Standardized wording for item descriptions.
  5. Abstracting procedures: Guidelines for compiling measured quantities into abstracts.

Key features of CESMM

CESMM specifically addresses civil engineering works, including earthworks, concrete, drainage, and roadworks. It extends SMM principles with additional clauses for complex civil projects.

Integration in abstracting sheets

When applying SMM/CESMM, abstract sheets must follow prescribed formats and item codes. This ensures abstracts are compatible with bills of quantities and tender documents prepared under these standards.

Worked Examples

Example 1: Apply SMM rules to abstract measured quantities for concrete works: volume measured as 25 m³, unit as cubic metres, item description per SMM guidelines.

Given:

  • Concrete volume = 25 m³

SMM requires:

  • Item description: "Concrete in foundations and columns"
  • Unit: cubic metres (m³)
Item Description Unit Quantity
Concrete in foundations and columns m³ 25

Example 2: Use CESMM to abstract earthworks: excavation measured at 50 m³, unit as cubic metres, item description per CESMM.

Given:

  • Excavation volume = 50 m³

CESMM requires:

  • Item description: "Excavation for substructure"
  • Unit: cubic metres (m³)
Item Description Unit Quantity
Excavation for substructure m³ 50

Example 3: Compile an abstract sheet segment applying SMM for plastering works: 100 m², unit square metres, standard description.

Given:

  • Plastering area = 100 m²

SMM requires:

  • Item description: "Cement and sand plaster 1:4 on walls"
  • Unit: square metres (m²)
Item Description Unit Quantity
Cement and sand plaster 1:4 on walls m² 100

Practice Questions

  1. Apply SMM rules to prepare an abstract for the following measured quantities: 30 m³ concrete, 4 tonnes reinforcement steel, 120 m² plastering. Provide item descriptions and units. (15 marks)
  2. Using CESMM, abstract the following civil engineering quantities: 60 m³ excavation, 20 m³ concrete footing, 150 m² road surfacing. Include proper descriptions and units. (15 marks)
  3. Prepare an abstract sheet segment applying SMM for wall finishes: 250 m² plastering, 100 m² tiling. (10 marks)

2.1.4 Reviewing abstracting accuracy

Reviewing the accuracy of abstracted quantities is essential to avoid cost overruns and disputes in Kenyan civil engineering projects. Accurate abstracts ensure that the quantities used for costing reflect actual site measurements.

Importance of review

Reviewing detects transcription errors, omissions, and inconsistencies between measurements and abstracts. It supports quality assurance before submission to clients or contractors.

Review methods

  1. Cross-checking with original measurements: Verify quantities against measurement sheets or site records.
  2. Consistency checks: Ensure units, item descriptions, and quantities are consistent throughout.
  3. Summation verification: Confirm totals and subtotals add correctly.
  4. Peer review: Have a colleague independently review the abstract sheet.
  5. Use of software tools: Employ spreadsheets or specialized software to automate checks.

Common errors to detect

  • Incorrect units or unit conversions.
  • Missing items or duplicated quantities.
  • Transcription mistakes in numbers or descriptions.
  • Mismatches between abstract and bill of quantities.
  • Mathematical errors in summations.

Worked Examples

Example 1: Review an abstract with concrete quantities: 15 m³ recorded, but abstract shows 12 m³. Identify and correct the error.

Given:

  • Measurement sheet: 15 m³ concrete
  • Abstract sheet: 12 m³ concrete

Step 1: Compare quantities
Step 2: Identify discrepancy of 3 m³
Step 3: Correct abstract quantity to 15 m³

Example 2: Check summation in an abstract sheet with quantities: 10 m³ concrete, 5 tonnes steel, 20 m² plastering. Total quantities must be correct.

Given:

  • Concrete: 10 m³
  • Steel: 5 tonnes
  • Plastering: 20 m²

Summation check:

  • Confirm individual totals match source measurements
  • Verify no arithmetic errors in totals

Example 3: Use spreadsheet formula to verify totals for a set of quantities: quantities 12, 15, 8, 10 units.

Given:

  • Quantities: 12, 15, 8, 10 units

Step 1: Sum quantities
Step 2: 12 + 15 = 27
Step 3: 27 + 8 = 35
Step 4: 35 + 10 = 45 units total

Compare with abstract total of 45 units for accuracy.

Practice Questions

  1. Review the following abstract quantities against measurements: Concrete, measurement 20 m³, abstract 18 m³; Steel, measurement 3 tonnes, abstract 3 tonnes; Plastering, measurement 150 m², abstract 150 m². Identify errors and correct them. (15 marks)
  2. Verify summations in an abstract sheet with the following quantities: Excavation 25 m³, Concrete 15 m³, Blockwork 200 m², Plastering 180 m². Confirm totals. (10 marks)
  3. Use spreadsheet methods to check the accuracy of the following quantities: 10, 12, 8, 15, 20 units. Calculate total and cross-check with abstract total of 65 units. (10 marks)
The rest of this chapter
🔒

Create a free account to open more of this chapter.

Free: practical guides, quick cards, workplace scenarios and more.

Create a free account
🔒2.2 Transferring Descriptions to Abstracting Sheet

Accurate transfer of item descriptions from measurement books to the abstracting sheet is critical in Kenyan civil engineering projects to ensure correct estimation and costing. This process requires meticulous attention to detail to avoid errors that could le…

🔒2.3 Transferring Squared Quantities to Abstracting Sheet

Transferring squared quantities such as areas or surface finishes accurately onto an abstracting sheet is a critical step in civil engineering measurement and estimation. In Kenya, where precise cost estimation impacts project budget adherence and contractor p…

🔒2.4 Calculation of Net Quantities

In civil engineering projects in Kenya, accurate calculation of net quantities is critical for effective resource planning, cost estimation, and contract management. Net quantities represent the actual measurable amount of work or materials needed after deduct…

🔒2.5 Running Through Dimensions

Running through dimensions is a critical phase in civil engineering measurement and estimation that ensures all recorded quantities correspond accurately to the actual site conditions and design requirements. In Kenya’s construction industry, precise dimension…

Chapter Summary

This chapter covers the preparation of the abstracting sheet, emphasizing the importance of selecting appropriate abstracting formats and organizing measurements clearly to enhance understanding. It outlines how to transfer item descriptions accurately from the booked measurements to the abstracting sheet while maintaining consistency and adhering to SMM and CESMM standards. The process of transferring squared quantities is detailed, highlighting the need for precise calculations and proper documentation using standard formats. Techniques for calculating net quantities are explained, including adjustments for project variations to ensure the final quantities reflect actual work done. The chapter also stresses the importance of reviewing all dimensions thoroughly, correcting errors, and verifying that measurements align precisely with project drawings. Throughout, adherence to established measurement standards and accuracy checks are underscored to maintain reliability in quantity surveying processes.

Self-Assessment

🔒 PDFDownload this self-assessment, with answers

Written Assessment

  1. A rectangular concrete slab measures 6 m in length, 4 m in width, and 0.15 m in thickness. Calculate the net quantity of concrete required for the slab in cubic metres. (2 marks)

  2. An excavation for a foundation is 3.5 m long, 2.5 m wide, and 1.2 m deep. Calculate the volume of earth to be excavated in cubic metres. (2 marks)

🔒18 more in this section.

Chapter Examination Questions

🔒 PDFDownload these examination questions, with worked answers

SECTION A (40 Marks) - Answer ALL Questions

  1. Explain the key components of an abstracting sheet used in civil engineering measurements and how they contribute to clarity during estimation. (4 marks)
  2. Describe the format differences between SMM and CESMM when preparing an abstracting sheet for a reinforced concrete slab. (4 marks)
🔒18 more in this section.

Chapter Practical Activities

Practical 1: Preparation of Abstracting Sheet for Measured Quantities 1200mm x 800mm

Civil Engineering · Level 6
Measurements, Estimation And Costing Principles II
PRACTICAL ASSESSMENT
TIME: 4 HOURS
⬇ PDFCandidate Instructions (Candidate Tool)

Type: Individual

INSTRUCTIONS TO CANDIDATE:
1.  You are required to perform the following task:
i.  Prepare an abstracting sheet of measured quantities for a building component 1200mm x 800mm as per the provided data sheet.
2.  You have been provided with the following resources for the practical task:
Tools & EquipmentMaterials
Tape measureStandard Abstracting Sheet template
CalculatorSet of measured quantities data sheet
Notebook
Pen
Ruler
⬇ PDFResources Required (Cutting List)
S/NItemQuantity
1PPEs (Safety boots, Overall, Gloves)1 set per Candidate
2Notebook1 pc per Candidate
3Pen1 pc per Candidate
4Calculator1 pc per Candidate
5Tape measure1 pc per Candidate
6Ruler1 pc per Candidate
7Standard Abstracting Sheet template1 pc per Candidate
8Set of measured quantities data sheet1 pc per Candidate
⬇ PDFAssessor Guide
Items to be EvaluatedMarks AvailableMarks ObtainedComments
TASK 1: Preparation Process
Wore PPEs (Safety boots, Overall, Gloves)
(Award 3 marks or zero)
3
Collected all necessary tools and materials
(Award 2 marks or zero)
2
Organized the workspace and set out the abstracting sheet template correctly
(Award 3 marks or zero)
3
Recorded measured quantities accurately from the data sheet
(Award 5 marks or zero)
5
Calculated totals and subtotals correctly
(Award 5 marks or zero)
5
Presented the abstracting sheet in a clear and organized format
(Award 4 marks or zero)
4
Verified all entries for accuracy and completeness
(Award 3 marks or zero)
3
Sub-Total25
PRODUCT CHECKLIST
Abstracting sheet completed with correct dimensions 1200mm x 800mm
(Award 4 marks or zero)
4
All measured quantities correctly abstracted and tabulated
(Award 6 marks or zero)
6
Calculations (totals, subtotals) accurate within ±2% variation
(Award 5 marks or zero)
5
Abstracting sheet clearly legible and well organized
(Award 5 marks or zero)
5
Sub-Total20
GRAND TOTAL45
ASSESSMENT OUTCOME:   ☐ Competent    ☐ Not Yet Competent (competent if at least 50%)

Practical 2: Abstracting Measured Quantities Using SMM/CESMM Standards

Civil Engineering · Level 6
Measurements, Estimation And Costing Principles II
PRACTICAL ASSESSMENT
TIME: 4 HOURS
⬇ PDFCandidate Instructions (Candidate Tool)

Type: Individual

INSTRUCTIONS TO CANDIDATE:
1.  You are required to perform the following task:
i.  Prepare an abstract of measured quantities for a reinforced concrete footing 2000mm length x 1500mm width x 500mm depth as per SMM/CESMM standards using the provided working drawing.
2.  You have been provided with the following resources for the practical task:
Tools & EquipmentMaterials
Tape measureSMM/CESMM Standard Codebook
Notebook and penWorking Drawing for Reinforced Concrete Footing
Calculator
⬇ PDFResources Required (Cutting List)
S/NItemQuantity
1PPEs (Overall, Safety boots, Gloves)1 set per Candidate
2Tape measure1 pc per Candidate
3Notebook and pen1 set per Candidate
4Calculator1 pc per Candidate
5SMM/CESMM Standard Codebook1 pc per Candidate
6Working Drawing for Reinforced Concrete Footing1 set per Candidate
⬇ PDFAssessor Guide
Items to be EvaluatedMarks AvailableMarks ObtainedComments
TASK 1: Applying SMM/CESMM Standards in Abstracting
Wore PPEs (Overall, Safety boots, Gloves)
(Award 3 marks or zero)
3
Collected all necessary tools and materials
(Award 2 marks or zero)
2
Set out the footing area on the working drawing correctly (measured length 2000mm, width 1500mm)
(Award 2 marks for length and 2 marks for width or zero)
4
Calculated the volume of concrete footing correctly using SMM/CESMM guidelines
(Award 5 marks or zero)
5
Abstracted quantities for excavation including volume and disposal as per SMM/CESMM
(Award 5 marks or zero)
5
Abstracted quantities for hardcore filling and compaction following SMM/CESMM
(Award 5 marks or zero)
5
Abstracted quantities for concrete work including volume and reinforcement as per SMM/CESMM
(Award 6 marks or zero)
6
Recorded all measurements and calculations clearly and legibly
(Award 3 marks or zero)
3
Followed SMM/CESMM item description and numbering accurately
(Award 3 marks or zero)
3
Sub-Total36
PRODUCT CHECKLIST
Abstracted quantities match footing dimensions: Length 2000mm
(Award 2 marks or zero)
2
Abstracted quantities match footing dimensions: Width 1500mm
(Award 2 marks or zero)
2
Abstracted quantities match footing dimensions: Depth 500mm
(Award 2 marks or zero)
2
Correct volume calculations for excavation, hardcore, and concrete
(Award 4 marks or zero)
4
Correct adherence to SMM/CESMM item descriptions and codes
(Award 4 marks or zero)
4
Sub-Total14
GRAND TOTAL50
ASSESSMENT OUTCOME:   ☐ Competent    ☐ Not Yet Competent (competent if at least 50%)
🔒

Free: practical guides, quick cards, workplace scenarios and more.

Create a free account
🔒Review and Verify Abstracted Quantities for Construction ProjectPractical 3
🔒Transfer and Abstract Item Descriptions to Abstracting SheetPractical 4
🔒Transferring Squared Quantities to Abstracting Sheet for a 4m x 3m WallPractical 5
🔒Calculation and Adjustment of Net Quantities for a Building ProjectPractical 6
🔒Running Through and Verifying Dimensions of a 1500mm x 800mm Wall SectionPractical 7
🔒Ensure Compliance with Project Abstracted Quantities for a 4x3x0.15m Concrete SlabPractical 8
🔒Abstract measured quantities using standard abstracting formatsPractical 9
🔒Copy Booked Item Descriptions Accurately for Abstracting SheetPractical 10
🔒Documenting Abstracted Measurements Accurately in the Abstract SheetPractical 11
🔒Adjust Quantities for Project Variations in Concrete Wall ConstructionPractical 12
🔒Confirming Dimensions Align with Drawings for a 1200mm x 800mm x 150mm Concrete SlabPractical 13
🔒Correction of Errors in Abstracted Measurement Quantities for a 4m x 2.5m Wall SectionPractical 14
🔒Review and Verify Abstracted Quantities for a Residential BuildingPractical 15
Flashcards 20 cards Study deck ▾
Question
1

↻ Tap card to reveal answer
🔒

18 more in this section.

Create a free account
Test Yourself 20 questions Start quiz ▾
0%
0 / 2
🔒

18 more in this section.

Create a free account
Am I competent?

At the start of this chapter we promised you would be able to:

  • Prepare an abstracting sheet correctly using the standard format.
  • Transfer descriptions of booked items to the abstracting sheet following SMM/CESMM standards.
  • Accurately transfer squared quantities to the abstracting sheet according to SMM/CESMM guidelines.
  • Calculate net quantities correctly by following SMM/CESMM procedures.
  • Run through dimensions accurately using the correct units of measurement.

Tick each one you can genuinely do.

So, are you there yet?

You're competent when you can confidently do 50% or more of what this chapter promised.

Sign in to record how you're doing.