Architecture  ·  Level 6
Engineering Survey Principles
Chapter 4: Appl surveying setting out works
📚 3 Topics
⚑ What you will be able to do

By the end of this chapter, you will be able to:

  • correctly assemble all the surveying setting out tools and equipment needed for your job
  • carry out setting out works accurately by following the right procedures step-by-step
  • document your setting out works clearly and accurately, meeting the required standards

Mastering these skills will help you deliver precise and reliable survey results, which are essential for successful engineering projects.

Surveying setting out works form a critical phase in architectural projects, translating design plans into precise physical points on the ground. For architects in Kenya, accurate setting out ensures that buildings conform to approved drawings, comply with regulatory standards, and optimize site utilization. This chapter focuses on the essential tools and equipment used in setting out, emphasizing their specifications, applications, and operational nuances in architectural practice. Understanding these instruments enhances precision in marking building lines, levels, and coordinates, reducing costly errors during construction.

4.1 Surveying Setting Out Tools and Equipment

Surveying tools are fundamental for architects to establish accurate reference points and alignments on site. The choice of equipment depends on project scale, required precision, and site conditions common in Kenyan urban and rural contexts. From traditional tape measures to advanced total stations, each instrument plays a unique role in facilitating efficient and reliable setting out.

4.1.1 Tape Measure

Name Specification Use
Tape Measure Steel or fiberglass tape, 30m or 50m length, metric units Measuring linear distances and verifying dimensions on site

Types of Tape Measures

Tape measures for architectural use vary by material and length, affecting durability and accuracy:

  • Steel Tape: Offers high durability and resistance to stretching, suitable for rugged site conditions like those found in Nairobi’s construction zones.
  • Fiberglass Tape: Lightweight and flexible, ideal for measuring over uneven terrain such as sloped sites in Kisumu.
  • Cloth or Nylon Tape: Less common in setting out due to susceptibility to stretching and damage, but useful for rough measurements.
  • Magnetic Tape: Incorporates magnets for attaching to metal surfaces, useful in metal frame constructions.
  • Graduation Markings: Metric tapes are standard in Kenya, graduated in millimeters and centimeters for precise reading.

Usage Techniques for Accuracy

Proper handling of the tape measure is vital to minimize errors in architectural layout:

  • Always pull the tape taut to avoid sagging, which causes inaccurate readings.
  • Ensure the tape lies flat against the surface without twists, essential when measuring corner to corner in foundation works.
  • Use a plumb bob or spirit level in conjunction with tape measurements to confirm vertical and horizontal alignments.
  • Read measurements at eye level to prevent parallax errors, especially when marking wall positions.
  • Calibrate tape measures regularly by comparing with a known standard length to detect wear or elongation.

Maintenance and Care

Maintaining tape measures extends their lifespan and preserves accuracy:

  • Clean the tape after use to remove dirt and moisture common in Kenyan construction environments.
  • Retract the tape slowly to prevent kinks or damage to the blade.
  • Store tapes in protective cases to avoid exposure to direct sunlight which can degrade fiberglass tapes.
  • Lubricate the tape blade occasionally to ensure smooth operation and prevent corrosion.
  • Replace worn or damaged tapes promptly to maintain measurement reliability.

4.1.2 Measuring Wheel

The measuring wheel is valuable for quickly gauging longer distances and irregular site boundaries where tape measures are impractical. Its use in architectural setting out in Kenya is common for site surveys and perimeter measurements.

Name Specification Use
Measuring Wheel Wheel diameter 250mm to 320mm, metric scale, foldable handle Measuring longer distances and irregular site outlines efficiently

Design Variations and Their Impact

Different measuring wheel designs affect usability and precision:

  • Standard Wheel: Fixed circumference, best for flat, even surfaces like building plots in urban areas.
  • Adjustable Wheel: Allows circumference changes for different scales, useful in varied terrain such as sloping sites.
  • Foldable Handle: Enhances portability for architects moving between multiple sites.
  • Digital Counters: Some models include electronic counters improving reading accuracy and data recording.
  • Durable Tires: Rubber tires provide traction on rough terrains common in rural Kenyan sites.

Operational Best Practices

To maximize accuracy during architectural setting out:

  • Walk at a steady pace to maintain consistent wheel rotation and avoid counting errors.
  • Calibrate the wheel by measuring a known distance before starting site measurements.
  • Avoid using the wheel on excessively rough or soft ground where slippage may occur.
  • Record readings immediately to prevent data loss or confusion.
  • Combine with other tools like the total station for critical measurements requiring high precision.

Maintenance for Longevity

Proper care ensures the measuring wheel remains reliable:

  • Clean the wheel surface regularly to prevent dirt buildup affecting rotation.
  • Check the counter mechanism for smooth operation and repair any faults promptly.
  • Store in a dry environment to prevent rust on metal parts.
  • Inspect wheel tire integrity frequently, replacing worn tires to maintain accurate circumference.
  • Lubricate moving parts to avoid stiffness and ensure smooth mobility.

4.1.3 Total Station

The total station is a sophisticated electronic instrument central to modern architectural surveying and setting out in Kenya. It integrates an electronic theodolite with an electronic distance meter, enabling precise measurement of angles and distances simultaneously.

Name Specification Use
Total Station Angular accuracy 1-5 seconds, distance accuracy ±(1-2)mm + 2ppm, integrated data recorder Measuring precise horizontal and vertical angles, distances, and coordinates for setting out complex architectural designs

Functional Components and Their Roles

Understanding the total station’s components clarifies its operational capabilities:

  • Electronic Theodolite: Measures horizontal and vertical angles with high precision.
  • Electronic Distance Meter (EDM): Calculates distances using infrared or laser signals.
  • Data Collector: Stores measurement data digitally, facilitating transfer to CAD software.
  • Telescope: Provides visual targeting of survey points with magnification.
  • Tribrach and Leveling Base: Ensures the instrument is perfectly leveled for accurate readings.

Advantages in Architectural Setting Out

The total station offers several benefits for architectural projects in Kenya:

  • Enables rapid and accurate layout of building corners, columns, and walls on uneven terrain.
  • Facilitates topographic surveys essential for site planning in hilly regions like the Kenyan highlands.
  • Allows integration with GPS and CAD tools for seamless design-to-site workflows.
  • Reduces human error through electronic measurement and data storage.
  • Supports complex computations such as coordinate transformations and curve setting.

Operational Procedures and Best Practices

Maximizing the total station’s effectiveness requires methodical operation:

  1. Set up the instrument securely on a tripod over a known reference point.
  2. Level the total station using the tribrach’s adjustment screws and built-in bubble levels.
  3. Input project parameters and coordinate systems into the data collector.
  4. Target the prism reflector held at the survey point and initiate measurement.
  5. Record horizontal angle, vertical angle, and distance data automatically.
  6. Transfer data to design software for verification and further processing.

4.1.4 Automatic Level

The automatic level is a precision optical instrument used to establish horizontal planes and determine height differences. In architectural setting out, it is critical for foundation leveling and floor elevations in Kenyan construction sites.

Name Specification Use
Automatic Level Magnification 24x, compensator range ±15', stadia lines for distance measurement Establishing horizontal benchmarks and vertical control for building elements

Principles of Operation

The automatic level uses an internal compensator to maintain a horizontal line of sight regardless of slight instrument tilt:

  • The compensator automatically adjusts the line of sight to remain level.
  • Stadia lines on the reticle allow approximate distance measurement by reading staff intercepts.
  • The telescope magnifies the target for clear sighting of leveling rods.
  • The instrument is mounted on a tripod for stability during measurement.
  • Leveling screws and bubble levels are used initially to roughly level the device before compensator action.

Applications in Architectural Setting Out

This instrument is essential for:

  • Establishing foundation levels to ensure structural stability on sites with uneven terrain.
  • Transferring design elevations from plans to physical site points.
  • Checking floor slab heights and verifying compliance with architectural specifications.
  • Setting out drainage slopes and pavement gradients.
  • Verifying vertical alignment during construction of walls and columns.

Accurate Use and Field Considerations

Proper use of the automatic level improves data reliability:

  • Position the instrument on solid ground to avoid movement during readings.
  • Perform initial rough leveling manually before relying on the compensator.
  • Read staff measurements at eye level to prevent parallax errors.
  • Take multiple readings and average results to minimize random errors.
  • Protect the instrument from dust and moisture prevalent in Kenyan construction sites to maintain optical clarity.

Practice Questions

  1. Describe the main types of tape measures used in architectural setting out and explain their suitability for different site conditions. (10 marks)
  2. Outline the operational steps for using a measuring wheel to survey a building site boundary. (12 marks)
  3. Explain the advantages of using a total station over traditional measurement methods in architectural projects. Provide examples relevant to Kenyan urban sites. (15 marks)
  4. Discuss the role of the automatic level in foundation setting out and describe key considerations for its accurate use. (13 marks)
The rest of this chapter
🔒

Create a free account to open more of this chapter.

Free: practical guides, quick cards, workplace scenarios and more.

Create a free account
🔒4.2 Setting out works

Setting out works are critical in architectural projects, forming the link between design and physical construction. In Kenya, precise setting out ensures that buildings and associated infrastructure comply with approved plans and local regulations such as the…

🔒4.3 Setting out works documented

Setting out works documentation is a critical phase in architectural surveying, providing a clear and precise record of the layout instructions for construction. In Kenya, architectural professionals rely on detailed setting out documents to communicate design…

Chapter Summary

This chapter explored the essential tools and equipment used in surveying setting out works, including the tape measure, measuring wheel, total station, and automatic level, each serving specific functions in accurate measurement and alignment. It then examined various types of setting out works, focusing on building setting out, paths setting out, and vehicular parking, highlighting the importance of precision in translating design plans to physical locations on site. The chapter emphasized the need for proper documentation of setting out works, detailing descriptions, quantities, recommended specifications, and ratios to ensure clarity and accountability during project execution. Understanding the selection and use of appropriate equipment contributes to efficient and reliable surveying outcomes. The practical applications in different setting out scenarios demonstrate the critical role of surveying in civil engineering projects. Proper recording of setting out data supports quality control and facilitates communication among project stakeholders. Overall, the chapter provided a comprehensive foundation for implementing surveying setting out tasks with accuracy and professionalism.

Self-Assessment

🔒 PDFDownload this self-assessment, with answers

A. Written Assessment

  1. Identify two key advantages of using a total station over a tape measure in architectural setting out. (3 marks)
  2. Describe the main function of an automatic level in building construction. (2 marks)
🔒20 more in this section.

Chapter Examination Questions

🔒 PDFDownload these examination questions, with worked answers

SECTION A (40 Marks) - Answer ALL Questions

  1. Explain the main advantages of using a total station over a tape measure in building setting out on a Nairobi construction site. (4 marks)
  2. Identify four key specifications to consider when selecting a measuring wheel for setting out pedestrian paths in a public park. (4 marks)
🔒18 more in this section.

Chapter Practical Activities

Practical 1: Measure and mark linear distances using tape measure for site setting out

Architecture · Level 6
Engineering Survey Principles
PRACTICAL ASSESSMENT
TIME: 4 HOURS
⬇ PDFCandidate Instructions (Candidate Tool)

Type: Individual

INSTRUCTIONS TO CANDIDATE:
1.  You are required to perform the following task:
i.  Measure and mark linear distances of 12,000mm, 8,500mm, 6,000mm, and 3,500mm on site as per the provided site layout plan.
2.  You have been provided with the following resources for the practical task:
Tools & EquipmentMaterials
Tape measure 30mCartridge A3 paper
PegsPencil HB
HammerEraser
Marker paint or chalk
⬇ PDFResources Required (Cutting List)
S/NItemQuantity
1Tape measure 30m1 Pc per Candidate
2Pegs8 Pcs per Candidate
3Hammer1 Pc per 5 Candidates
4Marker paint or chalk1 Pc per Candidate
5Cartridge A3 paper1 Pc per Candidate
6Pencil HB1 Pc per Candidate
7Eraser1 Pc per Candidate
⬇ PDFAssessor Guide
Items to be EvaluatedMarks AvailableMarks ObtainedComments
TASK 1: Use of tape measure to measure and mark distances
Wore the correct PPE: safety boots, helmet, reflective vest
(Award 1 mark each)
3
Selected and prepared the tape measure and pegs correctly
(Award 2 marks or zero)
2
Measured the specified linear distances accurately using the tape measure
(Award 1.5 marks for each of the four distances: 12000mm, 8500mm, 6000mm, 3500mm)
6
Marked the measured distances clearly on the ground using pegs and marker paint/chalk
(Award 1 mark for each correctly marked distance)
4
Verified measurements by re-checking at least two distances
(Award 1.5 marks for each correct verification)
3
Recorded the measurements legibly on the cartridge paper
(Award 2 marks or zero)
2
Sub-Total20
PRODUCT CHECKLIST
Measured distances marked on site are: 12000mm, 8500mm, 6000mm, 3500mm within ±10mm tolerance
(Award 1.5 marks for each distance correctly marked)
6
Pegs are securely fixed and clearly visible at each measured point
(Award 3 marks or zero)
3
Measurement records on cartridge paper are accurate and neatly written
(Award 3 marks or zero)
3
Sub-Total12
GRAND TOTAL32
ASSESSMENT OUTCOME:   ☐ Competent    ☐ Not Yet Competent (competent if at least 50%)

Practical 2: Measuring a 150m Path Using a Measuring Wheel

Architecture · Level 6
Engineering Survey Principles
PRACTICAL ASSESSMENT
TIME: 4 HOURS
⬇ PDFCandidate Instructions (Candidate Tool)

Type: Individual

INSTRUCTIONS TO CANDIDATE:
1.  You are required to perform the following task:
i.  Measure and record the length of a 150m marked path using a measuring wheel with accuracy within ±0.5m.
2.  You have been provided with the following resources for the practical task:
Tools & EquipmentMaterials
Measuring wheel with odometerSurveyor's notebook
Measuring tape 30m
Pencil
⬇ PDFResources Required (Cutting List)
S/NItemQuantity
1Measuring wheel with odometer1 Pc per Candidate
2Surveyor's notebook1 Pc per Candidate
3Pencil1 Pc per Candidate
4Measuring tape 30m1 Pc per Candidate
5Safety helmet1 Pc per Candidate
6High visibility vest1 Pc per Candidate
7Work boots1 Pair per Candidate
⬇ PDFAssessor Guide
Items to be EvaluatedMarks AvailableMarks ObtainedComments
TASK 1: Preparation and Safety
Wears correct personal protective equipment (helmet, vest, boots)
(Award 1 mark each for helmet, vest, boots)
3
Inspects measuring wheel for functionality and calibration
(Award 2 marks for proper inspection and zero if not)
2
Plans route and identifies start and end points of the path
(Award 2 marks for clear identification and planning)
2
Sub-Total7
TASK 2: Measuring Procedure
Starts measuring at the exact designated start point
(Award 2 marks for accuracy in starting point)
2
Rolls measuring wheel steadily along the path without skipping or lifting
(Award 3 marks for smooth and continuous rolling)
3
Stops measuring exactly at the marked end point
(Award 2 marks for accurate stopping)
2
Records measurement in surveyor's notebook clearly and legibly
(Award 3 marks for clear, legible recording)
3
Verifies measurement by cross-checking with measuring tape
(Award 3 marks for proper verification and correction if needed)
3
Sub-Total13
TASK 3: Finishing and Equipment Care
Cleans and stores measuring wheel properly after use
(Award 2 marks for proper care and storage)
2
Disposes of any waste or debris from measurement area
(Award 1 mark for tidiness)
1
Sub-Total3
PRODUCT CHECKLIST
Recorded path length measurement within ±0.5m accuracy of actual 150m length
(Award 10 marks for accuracy within tolerance, zero if outside)
10
Measurement documentation is neat, complete, and correctly labeled with date and candidate name
(Award 5 marks for complete and neat documentation)
5
Sub-Total15
GRAND TOTAL38
ASSESSMENT OUTCOME:   ☐ Competent    ☐ Not Yet Competent (competent if at least 50%)
🔒

Free: practical guides, quick cards, workplace scenarios and more.

Create a free account
🔒Setting out control points using a total station for a 30m x 20m site layoutPractical 3
🔒Using Automatic Level to Determine Height Differences on SitePractical 4
🔒Building Foundation Lines Setting Out Using Tape and Total StationPractical 5
🔒Setting out a Pedestrian Path 30m x 2mPractical 6
🔒Setting Out Vehicular Parking Bays Using Total Station and Tape MeasurePractical 7
🔒Documenting Setting Out Works for a Site Layout of 40m x 30mPractical 8
🔒Setting Out a Small Rectangular Site Feature Using Automatic Level and Tape MeasurePractical 9
🔒Calibration and Maintenance of Surveying EquipmentPractical 10
Flashcards 20 cards Study deck ▾
Question
1

↻ Tap card to reveal answer
🔒

18 more in this section.

Create a free account
Test Yourself 20 questions Start quiz ▾
0%
0 / 2
🔒

18 more in this section.

Create a free account
Am I competent?

At the start of this chapter we promised you would be able to:

  • correctly assemble all the surveying setting out tools and equipment needed for your job
  • carry out setting out works accurately by following the right procedures step-by-step
  • document your setting out works clearly and accurately, meeting the required standards

Tick each one you can genuinely do.

So, are you there yet?

You're competent when you can confidently do 50% or more of what this chapter promised.

Sign in to record how you're doing.