By the end of this chapter, you will be able to:
Mastering this skill helps you contribute to efficient business operations and smarter financial planning in the trade.
Compiled by: Wesley Rotich
Production costs are the payments a firm makes, and the sacrifices it bears, in order to produce goods or services: payments for raw materials, labour, rent, power, transport and the use of machines. Economists classify these costs according to how they behave when output changes, because that behaviour determines how much a firm should produce and at what price it can sell. For a procurement officer the classification matters too: it shows which purchases rise with every unit produced (materials, packaging) and which stay the same whatever the output (rent, insurance, salaried staff). Example: a furniture workshop pays the same rent each month whether it makes 10 or 50 chairs, but its spending on timber, glue and varnish rises with every chair made.
A small furniture workshop has the following weekly costs (Ksh):
| Output (chairs) | Fixed cost (FC) | Variable cost (VC) | Total cost (TC = FC + VC) | Marginal cost per chair |
|---|---|---|---|---|
| 0 | 20,000 | 0 | 20,000 | |
| 10 | 20,000 | 30,000 | 50,000 | (50,000 − 20,000) ÷ 10 = 3,000 |
| 20 | 20,000 | 50,000 | 70,000 | (70,000 − 50,000) ÷ 10 = 2,000 |
| 30 | 20,000 | 66,000 | 86,000 | (86,000 − 70,000) ÷ 10 = 1,600 |
| 40 | 20,000 | 88,000 | 108,000 | (108,000 − 86,000) ÷ 10 = 2,200 |
| 50 | 20,000 | 120,000 | 140,000 | (140,000 − 108,000) ÷ 10 = 3,200 |
Fixed costs are costs that do not change with the level of output in the short run. They must be paid even when the firm produces nothing, which is why they are also called overhead, indirect or supplementary costs. In the schedule, the workshop's fixed cost is Ksh 20,000 a week at every level of output, including zero. Fixed costs exist only in the short run: in the long run the firm can change its premises, machines and contracts, so all costs become variable.
Variable costs are costs that change directly with the level of output: they are zero when nothing is produced and rise as output rises. They are also called prime, direct or operating costs. In the schedule, variable cost rises from Ksh 0 at zero output to Ksh 120,000 at 50 chairs. Variable costs usually rise at a falling rate at first, as workers and machines are used more efficiently, and then at a rising rate as the fixed plant becomes crowded (the law of diminishing returns).
Total cost is the sum of all the costs of producing a given level of output: total fixed cost plus total variable cost.
TC = TFC + TVC
At zero output total cost equals fixed cost (Ksh 20,000 in the schedule), and as output rises total cost rises by the amount of the extra variable cost. The total cost curve therefore starts on the vertical axis at the level of fixed cost and has the same shape as the variable cost curve, lying above it by the constant amount of fixed cost.
Example: at 30 chairs, TC = 20,000 + 66,000 = Ksh 86,000.
Opportunity cost is the value of the next best alternative that is given up when a choice is made. Because resources are scarce, using money, materials, labour or premises for one purpose means they cannot be used for another; the benefit lost from that other use is the real economic cost of the choice. Opportunity cost is often not paid in cash, so it does not appear in the accounts, but it must be considered in every economic decision.
Example: the owner of the workshop uses a room she owns as a store instead of renting it out for Ksh 15,000 a month. Although no rent is paid, the opportunity cost of using the room as a store is Ksh 15,000 a month.
Example from procurement: a firm ties up Ksh 2,000,000 in excess stock for a year when the money could have earned 10% a year in a fixed deposit. The opportunity cost of holding the stock is 10% × 2,000,000 = Ksh 200,000 a year.
Marginal cost is the addition to total cost from producing one more unit of output.
MC = change in total cost ÷ change in output = ΔTC ÷ ΔQ
Because fixed cost does not change with output, marginal cost depends only on the change in variable cost. In the schedule, increasing output from 20 to 30 chairs raises total cost from Ksh 70,000 to Ksh 86,000, so:
MC = (86,000 − 70,000) ÷ (30 − 20)
= 16,000 ÷ 10
= Ksh 1,600 per chair
A buyer offers to purchase an extra 10 chairs at Ksh 2,500 each when the workshop is producing 30 chairs. Raising output to 40 chairs adds Ksh 2,200 per chair to cost (marginal cost from 30 to 40 chairs). Since Ksh 2,500 is greater than Ksh 2,200, the order adds 10 × (2,500 − 2,200) = Ksh 3,000 to profit, provided it does not affect the price paid by other buyers.
Create a free account to open more of this chapter.
Free: practical guides, quick cards, workplace scenarios and more.
Create a free accountThis chapter explored the classification of production costs, detailing fixed costs that remain constant regardless of output, variable costs that change with production levels, total cost as the sum of fixed and variable costs, opportunity costs representing foregone alternatives, and marginal cost as the expense of producing one additional unit. It then examined short run cost analysis where some inputs are fixed, contrasting with long run cost analysis in which all inputs are variable and firms can adjust all factors of production. The chapter also analyzed cost curves, illustrating relationships between output and various cost measures. Finally, it addressed the optimal size of the firm by discussing economies of scale, highlighting how increasing production can reduce average costs and improve efficiency. These concepts collectively provide a comprehensive understanding of how firms manage costs to maximize profitability.
At the start of this chapter we promised you would be able to:
Tick each one you can genuinely do.
So, are you there yet?
You're competent when you can confidently do 50% or more of what this chapter promised.
Sign in to record how you're doing.